P3079 Captus Load
Project P3079
DTS 74.9 MWMW type: Data LoadProject type: ConnectionStage 2 · Assessment phaseActiveEN1 ISD 2027-09-01
75 DTS MW is reported across 3 projects in the surrounding Glenwood planning area, ranked 20 of 43 by listed DTS MW.
The known physical and administrative context for this facility.
DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service.