County grid record
Grid connection in County of Warner No. 5
County of Warner No. 5 has 6 tracked substations on Alberta’s transmission grid. Browse the local grid from the map into each individual station record.
Tracked substations6
Voltage levels69, 138 kV
Planning areasGlenwood, Lethbridge, Vauxhall
Infrastructure map
Boundary and substations
Use this preview to orient yourself, then open the full infrastructure map to explore the surrounding area.
Substations
Substations in County of Warner No. 5
Ordered from highest to lowest voltage. Open a station for its Connection Project List context, nearby infrastructure, and full record.
Conrad 135S→
138 kVVauxhall planning areaPlanning region: South
Irrican Power 314S→
138 kVLethbridge planning areaPlanning region: South
Raymond Reservoir 313S→
138 kVGlenwood planning areaPlanning region: South
Red Coat 967S→
138 kVLethbridge planning areaPlanning region: South
Stirling 67S→
69/138 kVGlenwood planning areaPlanning region: South
Warner 344S→
69 kVGlenwood planning areaPlanning region: South