P2256 ATCO Poplar Hill Load
Project P2256
DTS 34.5 MWMW type: Distribution LoadProject type: ConnectionStage 4 · AUC ApplicationsActiveEN1 ISD 2027-05-25
93 DTS MW is reported across 8 projects in the surrounding Grande Prairie planning area, ranked 19 of 43 by listed DTS MW.
The known physical and administrative context for this facility.
DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service.