P3192 Blumenort 832S Contract Change
Project P3192
DTS 11.484 MWMW type: Distribution LoadProject type: ContractStage 3 · Regulatory PreparationActiveEN1 ISD 2026-09-01
16 DTS MW is reported across 2 projects in the surrounding High Level planning area, ranked 27 of 43 by listed DTS MW.
The known physical and administrative context for this facility.
DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service.