Planning area

High Level planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the High Level planning area.

DTS MW in current Project List16 MW
Projects currently listed2
Tracked substations3

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in High Level

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in High Level

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 3 · Regulatory Preparation2 projects
P3191 High Level 786S Contract Change
Project P3191
DTS 4.95 MWMW type: Distribution LoadStage 3 · Regulatory PreparationActiveProject type: ContractEN1 ISD 2026-09-01
P3192 Blumenort 832S Contract Change
Project P3192
DTS 11.484 MWMW type: Distribution LoadStage 3 · Regulatory PreparationActiveProject type: ContractEN1 ISD 2026-09-01