Judy Creek

25 DTS MW is reported across 5 projects in the surrounding Swan Hills planning area, ranked 26 of 43 by listed DTS MW.

69 kVSwan HillsWoodlands County
Record

Substation details

The known physical and administrative context for this facility.

Facility code638S
Voltage69 kV
Planning areaSwan Hills
Planning regionNorthwest
CountyWoodlands County
DLS land description63-11-W5
Show on infrastructure map →
Connection Project List context

Projects in Swan Hills

Stage 3 · Regulatory Preparation4 projects
Stage 6 · Close Out1 project

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service.

Sort by
P3039 Evolve Battery
Project P3039
DTS 25 MWSTS 25 MWMW type: Battery StorageProject type: BTFStage 3 · Regulatory PreparationActiveEN1 ISD 2027-06-30
P2983 Moraine MPC Gas
Project P2983
DTS 7.45 MWSTS 465 MWMW type: GasProject type: ConnectionStage 3 · Regulatory PreparationActiveEN1 ISD 2028-02-01EN2 ISD 2028-02-01
P3149 Imperial Oil Carson Lake 996S Contract Change
Project P3149
DTS -0.4 MWMW type: Distribution LoadProject type: ContractStage 3 · Regulatory PreparationActiveEN1 ISD 2026-11-01
P3145 Mobil Oil Carson Creek 887S Contract Change
Project P3145
DTS -1.9 MWMW type: Distribution LoadProject type: ContractStage 3 · Regulatory PreparationActiveEN1 ISD 2026-11-01
P3188 Morse River 851S Contract Change
Project P3188
DTS -5.5 MWMW type: Distribution LoadProject type: ContractStage 6 · Close OutRecently EnergizedEN1 ISD 2026-06-23