Planning area

Swan Hills planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Swan Hills planning area.

DTS MW in current Project List25 MW
Projects currently listed5
Tracked substations23

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Swan Hills

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Swan Hills

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 3 · Regulatory Preparation4 projects
Stage 6 · Close Out1 project
P2983 Moraine MPC Gas
Project P2983
DTS 7.45 MWSTS 465 MWMW type: GasStage 3 · Regulatory PreparationActiveProject type: ConnectionEN1 ISD 2028-02-01EN2 ISD 2028-02-01
P3039 Evolve Battery
Project P3039
DTS 25 MWSTS 25 MWMW type: Battery StorageStage 3 · Regulatory PreparationActiveProject type: BTFEN1 ISD 2027-06-30
P3145 Mobil Oil Carson Creek 887S Contract Change
Project P3145
DTS -1.9 MWMW type: Distribution LoadStage 3 · Regulatory PreparationActiveProject type: ContractEN1 ISD 2026-11-01
P3149 Imperial Oil Carson Lake 996S Contract Change
Project P3149
DTS -0.4 MWMW type: Distribution LoadStage 3 · Regulatory PreparationActiveProject type: ContractEN1 ISD 2026-11-01
P3188 Morse River 851S Contract Change
Project P3188
DTS -5.5 MWMW type: Distribution LoadStage 6 · Close OutRecently EnergizedProject type: ContractEN1 ISD 2026-06-23