Substation record 580S

Sylvan Lake

498 DTS MW is reported across 7 projects in the surrounding Red Deer planning area, ranked 10 of 43 by listed DTS MW.

138 kVRed DeerRed Deer County
Record

Substation details

The known physical and administrative context for this facility.

Facility code580S
Voltage138 kV
Planning areaRed Deer
Planning regionCentral
CountyRed Deer County
DLS land description38-1-W5
Show on infrastructure map →
Connection Project List context

Projects in Red Deer

Stage 2 · Assessment phase3 projects
Stage 3 · Regulatory Preparation2 projects
Stage 4 · AUC Applications1 project
Stage 6 · Close Out1 project

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service.

Sort by
P3155 Myers Energy Park MPC Data Load
Project P3155
DTS 280 MWMW type: Data LoadProject type: ConnectionStage 2 · Assessment phaseRecently Cancelled
P3034 Valley Edge Battery
Project P3034
DTS 200 MWSTS 250 MWMW type: Battery StorageProject type: ConnectionStage 3 · Regulatory PreparationActiveEN1 ISD 2028-10-01
P3040 AHI Prairie Eagle Cogen
Project P3040
DTS 10 MWSTS 150 MWMW type: Cogen + Solar + StorageProject type: ConnectionStage 3 · Regulatory PreparationISD Under Review
P2602 Collisard MPC Gas
Project P2602
DTS 3 MWSTS 120 MWMW type: GasProject type: ConnectionStage 4 · AUC ApplicationsActiveEN1 ISD 2029-01-31EN2 ISD 2029-01-31
P2981 Myers Energy Park MPC Gas
Project P2981
DTS 3 MWSTS 178 MWMW type: GasProject type: ConnectionStage 2 · Assessment phaseRecently Cancelled
P2982 Gilby Power Park MPC Gas
Project P2982
DTS 3 MWSTS 178 MWMW type: GasProject type: ConnectionStage 2 · Assessment phaseRecently Cancelled
P3202 Haynes 482S Contract Change
Project P3202
DTS -1.4 MWMW type: Distribution LoadProject type: ContractStage 6 · Close OutRecently EnergizedEN1 ISD 2026-07-16
Nearby infrastructure

Nearby substations

Sylvan Lake (580S) Substation & Grid Context | GridLens