Planning area

Wainwright planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Wainwright planning area.

DTS MW in current Project List12 MW
Projects currently listed4
Tracked substations11

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Wainwright

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Wainwright

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 1 · Assessment phase1 project
Stage 2 · Assessment phase1 project
Stage 3 · Regulatory Preparation2 projects
P2753 Jarrow 252S DER Solar Battery
Project P2753
STS 5.5 MWMW type: Solar + StorageStage 3 · Regulatory PreparationActiveProject type: BTFEN1 ISD 2027-11-30EN2 ISD 2027-11-30
P2754 Tucuman 478S DER Solar Battery
Project P2754
STS 13.8 MWMW type: Solar + StorageStage 3 · Regulatory PreparationActiveProject type: BTFEN1 ISD 2027-11-30EN2 ISD 2027-11-30
P3135 Battlesands 594S, Clipper 656S & Rosyth 296S Contract Change
Project P3135
DTS 11.7 MWMW type: Industrial LoadStage 2 · Assessment phaseActiveProject type: ContractEN1 ISD 2027-04-01EN2 ISD 2028-04-01
P3173 Battle Sands Gas
Project P3173
STS 4.9 MWMW type: GasStage 1 · Assessment phaseActiveProject type: BTFEN1 ISD 2028-06-01EN2 ISD 2028-06-01