Planning area

Valleyview planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Valleyview planning area.

DTS MW in current Project List53 MW
Projects currently listed5
Tracked substations6

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Valleyview

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Valleyview

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 3 · Regulatory Preparation5 projects
P2713 Little Smoky 1 Solar
Project P2713
DTS 1 MWSTS 448 MWMW type: SolarStage 3 · Regulatory PreparationActiveProject type: ConnectionEN1 ISD 2028-07-15EN2 ISD 2028-07-15
P2722 Sturgeon 734S DER Solar
Project P2722
STS 24 MWMW type: SolarStage 3 · Regulatory PreparationRecently CancelledProject type: BTF
P2738 Little Smoky 4 Solar
Project P2738
DTS 1 MWSTS 79 MWMW type: SolarStage 3 · Regulatory PreparationRecently CancelledProject type: Connection
P2757 Sturgeon 734S DER Battery
Project P2757
STS 22 MWMW type: Battery StorageStage 3 · Regulatory PreparationActiveProject type: BTFEN1 ISD 2028-05-01
P3065 UK LS2 & LS6 Solar Battery
Project P3065
DTS 51 MWSTS 169 MWMW type: Solar + StorageStage 3 · Regulatory PreparationActiveProject type: ConnectionEN1 ISD 2027-12-20EN2 ISD 2028-07-01EN3 ISD 2028-07-01