Planning area

Sheerness planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Sheerness planning area.

DTS MW in current Project List872 MW
Projects currently listed5
Tracked substations8

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Sheerness

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Sheerness

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 1 · Assessment phase2 projects
Stage 5 · Construction2 projects
Stage 6 · Close Out1 project
P2369 ATCO Anderson 801S DER Solar
Project P2369
STS 12.3 MWMW type: SolarStage 5 · ConstructionActiveProject type: BTFEN1 ISD 2027-11-03
P2464 Sunnynook Solar Battery
Project P2464
DTS 2 MWSTS 280 MWMW type: Solar + StorageStage 5 · ConstructionActiveProject type: ConnectionEN1 ISD 2029-08-31
P3137 Sheerness Data MPC Load
Project P3137
DTS 800 MWMW type: Data LoadStage 1 · Assessment phaseISD Under ReviewProject type: Connection
P3185 Anderson 801S Contract Change
Project P3185
DTS -4.5 MWMW type: Distribution LoadStage 6 · Close OutRecently EnergizedProject type: ContractEN1 ISD 2026-06-23
P3227 Sheerness Data Load
Project P3227
DTS 74.9 MWMW type: Data LoadStage 1 · Assessment phaseActiveProject type: ConnectionEN1 ISD 2028-02-04