Planning area

Lloydminster planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Lloydminster planning area.

DTS MW in current Project List6 MW
Projects currently listed2
Tracked substations8

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Lloydminster

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Lloydminster

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 3 · Regulatory Preparation1 project
Stage 6 · Close Out1 project
P3186 Briker 880S Contract Change
Project P3186
DTS -4.7 MWMW type: Distribution LoadStage 6 · Close OutRecently EnergizedProject type: ContractEN1 ISD 2026-06-23
P3189 Lloydminster 716S Contract Change
Project P3189
DTS 11 MWMW type: Distribution LoadStage 3 · Regulatory PreparationActiveProject type: ContractEN1 ISD 2026-09-01