P2969 Cadomin Area Load
Project P2969
DTS 2.5 MWMW type: Distribution LoadStage 5 · ConstructionActiveProject type: ConnectionEN1 ISD 2027-01-01EN2 ISD 2027-07-01EN3 ISD 2028-09-01
A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Hinton/Edson planning area.
DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.
Open a substation for its physical record, county context, and nearby facilities.
Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.