Planning area

Hinton/Edson planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Hinton/Edson planning area.

DTS MW in current Project List139 MW
Projects currently listed8
Tracked substations22

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Hinton/Edson

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Hinton/Edson

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 1 · Assessment phase2 projects
Stage 2 · Assessment phase5 projects
Stage 5 · Construction1 project
P2969 Cadomin Area Load
Project P2969
DTS 2.5 MWMW type: Distribution LoadStage 5 · ConstructionActiveProject type: ConnectionEN1 ISD 2027-01-01EN2 ISD 2027-07-01EN3 ISD 2028-09-01
P3114 Banshee Data MPC Load
Project P3114
DTS 74.9 MWMW type: Data LoadStage 2 · Assessment phaseActiveProject type: ConnectionEN1 ISD 2027-11-01
P3201 Jasper Area Industrial Load
Project P3201
DTS 16.2 MWMW type: Industrial LoadStage 1 · Assessment phaseActiveProject type: ConnectionEN1 ISD 2028-09-01
P3205 Obed Industrial Load
Project P3205
DTS 13 MWMW type: Industrial LoadStage 2 · Assessment phaseActiveProject type: ConnectionEN1 ISD 2028-09-01
P3206 Wolf Industrial Load
Project P3206
DTS 17 MWMW type: Industrial LoadStage 2 · Assessment phaseActiveProject type: ConnectionEN1 ISD 2028-12-01EN2 ISD 2029-04-01
P3208 Hinton Industrial Load
Project P3208
DTS 3 MWMW type: Industrial LoadStage 2 · Assessment phaseActiveProject type: BTFEN1 ISD 2028-12-01