P3236 AEC Mill 844S Data Load
Project P3236
DTS 60 MWMW type: Data LoadStage 1 · Assessment phaseActiveProject type: BTFEN1 ISD 2028-07-15
A top-to-bottom view of transmission infrastructure and grid connection projects listed across the High Prairie planning area.
DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.
Open a substation for its physical record, county context, and nearby facilities.
Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.