Planning area

Fox Creek planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Fox Creek planning area.

DTS MW in current Project List12 MW
Projects currently listed4
Tracked substations10

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Fox Creek

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Fox Creek

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 1 · Assessment phase1 project
Stage 2 · Assessment phase2 projects
Stage 5 · Construction1 project
P2456 Opal Gas
Project P2456
DTS 0.4 MWSTS 98.5 MWMW type: GasStage 5 · ConstructionActiveProject type: ConnectionEN1 ISD 2027-07-30
P3140 Chevron Kaybob 551S Contract Change
Project P3140
MW type: Salvage/DecommissionStage 2 · Assessment phaseActiveProject type: ContractEN1 ISD 2026-09-01
P3141 Opal Data Load
Project P3141
MW type: Data LoadStage 1 · Assessment phaseActiveProject type: BTFEN1 ISD 2027-08-06
P3200 South Kaybob Industrial Load
Project P3200
DTS 12 MWMW type: Distribution LoadStage 2 · Assessment phaseActiveProject type: BTFEN1 ISD 2026-09-01