Planning area

Fort Saskatchewan planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Fort Saskatchewan planning area.

DTS MW in current Project List5,187 MW
Projects currently listed17
Tracked substations30

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Fort Saskatchewan

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Fort Saskatchewan

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 1 · Assessment phase3 projects
Stage 2 · Assessment phase6 projects
Stage 3 · Regulatory Preparation5 projects
Stage 4 · AUC Applications1 project
Stage 5 · Construction2 projects
P2513 Shell Scotford Substation Reliability
Project P2513
MW type: OtherStage 5 · ConstructionActiveProject type: ConnectionEN1 ISD 2027-11-25
P2524 Shell SR Scotford Solar
Project P2524
MW type: SolarStage 5 · ConstructionActiveProject type: BTFEN1 ISD 2024-06-20EN2 ISD 2028-03-17
P2533 Greenlight Gas
Project P2533
DTS 20 MWSTS 466 MWMW type: GasStage 3 · Regulatory PreparationActiveProject type: ConnectionEN1 ISD 2028-06-01
P2614 Dow Fort Sask. Load
Project P2614
DTS 231 MWMW type: Industrial LoadStage 4 · AUC ApplicationsActiveProject type: ConnectionEN1 ISD 2027-09-01
P2796 Greenlight U2 Gas
Project P2796
DTS 20 MWSTS 466 MWMW type: GasStage 3 · Regulatory PreparationActiveProject type: ConnectionEN1 ISD 2028-06-01
P2797 Greenlight U3 Gas
Project P2797
DTS 20 MWSTS 466 MWMW type: GasStage 3 · Regulatory PreparationActiveProject type: ConnectionEN1 ISD 2028-06-01