Planning area

Didsbury planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Didsbury planning area.

DTS MW in current Project List1,061 MW
Projects currently listed4
Tracked substations7

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Didsbury

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Didsbury

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 1 · Assessment phase1 project
Stage 2 · Assessment phase1 project
Stage 3 · Regulatory Preparation1 project
Stage 4 · AUC Applications1 project
P2552 Lone Butte Solar
Project P2552
DTS 2 MWSTS 450 MWMW type: SolarStage 4 · AUC ApplicationsActiveProject type: ConnectionEN1 ISD 2027-11-01EN2 ISD 2027-11-01
P2967 Clearwater Facility Cogen
Project P2967
DTS 35 MWSTS 15 MWMW type: CogenStage 3 · Regulatory PreparationRecently CancelledProject type: Connection
P3101 Carstairs Technology Park MPC Load
Project P3101
DTS 950 MWMW type: Data LoadStage 2 · Assessment phaseISD Under ReviewProject type: Connection
P3219 Clearwater Industrial Load
Project P3219
DTS 74 MWMW type: Industrial LoadStage 1 · Assessment phaseActiveProject type: ConnectionEN1 ISD 2029-07-01