Planning area

Cold Lake planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Cold Lake planning area.

DTS MW in current Project List299 MW
Projects currently listed5
Tracked substations21

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Cold Lake

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Cold Lake

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 1 · Assessment phase1 project
Stage 3 · Regulatory Preparation2 projects
Stage 5 · Construction2 projects
P2034 Cold Lake Energy Lindbergh Cogeneration
Project P2034
DTS 3 MWSTS 72 MWMW type: CogenStage 5 · ConstructionActiveProject type: ConnectionEN1 ISD 2029-07-30EN2 ISD 2029-10-01
P2628 Foster Creek Load
Project P2628
DTS 41 MWMW type: Industrial LoadStage 5 · ConstructionActiveProject type: BTFEN1 ISD 2027-05-01
P2845 Marguerite Lake CAE Storage
Project P2845
DTS 125 MWSTS 320 MWMW type: Compressed Air Energy StorageStage 3 · Regulatory PreparationActiveProject type: ConnectionEN1 ISD 2029-03-31EN2 ISD 2029-03-31
P3046 Marguerite Lake Compressed Air Phase 2
Project P3046
DTS 125 MWSTS 320 MWMW type: Compressed Air Energy StorageStage 3 · Regulatory PreparationActiveProject type: ConnectionEN1 ISD 2029-09-01EN2 ISD 2029-09-01
P3176 Leming Lake 715S DER Wasteheat
Project P3176
DTS 4.5 MWSTS 3 MWMW type: WasteheatStage 1 · Assessment phaseActiveProject type: BTFEN1 ISD 2030-06-30EN2 ISD 2030-06-30