Brooks planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Brooks planning area.

DTS MW in current Project List1,200 MW
Projects currently listed2
Tracked substations11

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Brooks

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Brooks

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 2 · Assessment phase1 project
Stage 5 · Construction1 project
P2195 FortisAlberta Bassano 435S DER Solar
Project P2195
STS 4.65 MWMW type: SolarStage 5 · ConstructionActiveProject type: BTFEN1 ISD 2024-03-25EN2 ISD 2027-06-01
P3109 Newell Data Center MPC Load
Project P3109
DTS 1,200 MWMW type: Data LoadStage 2 · Assessment phaseISD Under ReviewProject type: Connection