Planning area

Airdrie planning area

A top-to-bottom view of transmission infrastructure and grid connection projects listed across the Airdrie planning area.

DTS MW in current Project List306 MW
Projects currently listed6
Tracked substations6

DTS and STS figures represent contract-capacity changes reported in the Connection Project List. They do not represent available transmission capacity, current site demand, or guaranteed service. Planning-area totals should not be attributed to a specific substation.

Substations

Infrastructure in Airdrie

Open a substation for its physical record, county context, and nearby facilities.

Connection projects

Projects listed in Airdrie

Connection process stage breakdown, and each project's published type, MW type, status, stage and reported in-service dates. A later stage number indicates further progress toward energization; Stage 6 is Close Out and can follow energization.

Stage 1 · Assessment phase1 project
Stage 2 · Assessment phase4 projects
Stage 3 · Regulatory Preparation1 project
P2980 Lone Pine Energy Park MPC Gas
Project P2980
DTS 3 MWSTS 178 MWMW type: GasStage 2 · Assessment phaseRecently CancelledProject type: Connection
P3099 Sollair BESS
Project P3099
DTS 0.5 MWMW type: Battery StorageStage 2 · Assessment phaseActiveProject type: BTFEN1 ISD 2027-12-10
P3126 Sollair Load
Project P3126
DTS 4.99 MWMW type: Data LoadStage 2 · Assessment phaseActiveProject type: BTFEN1 ISD 2027-12-10
P3131 Sollair 1055S Solar Modification
Project P3131
STS 4.99 MWMW type: SolarStage 3 · Regulatory PreparationISD Under ReviewProject type: BTF
P3154 Lone Pine Energy Park MPC Data Load
Project P3154
DTS 280 MWMW type: Data LoadStage 2 · Assessment phaseRecently CancelledProject type: Connection
P3213 East Airdrie 199S Distribution Load
Project P3213
DTS 17.671 MWMW type: Distribution LoadStage 1 · Assessment phaseISD Under ReviewProject type: BTF