County grid record
Grid connection in Brazeau County
Brazeau County has 5 tracked substations on Alberta’s transmission grid. Browse the local grid from the map into each individual station record.
Tracked substations5
Voltage levels138, 240 kV
Planning areasDrayton Valley
Infrastructure map
Boundary and substations
Use this preview to orient yourself, then open the full infrastructure map to explore the surrounding area.
Substations
Substations in Brazeau County
Ordered from highest to lowest voltage. Open a station for its Connection Project List context, nearby infrastructure, and full record.
Brazeau 62S→
138/240 kVDrayton Valley planning areaPlanning region: Central
Brazeau Outlet Works 294S→
138 kVDrayton Valley planning areaPlanning region: Central
Lodgepole 61S→
138 kVDrayton Valley planning areaPlanning region: Central
Violet Grove 283S→
138 kVDrayton Valley planning areaPlanning region: Central
West Pembina (Esso) 359S→
138 kVDrayton Valley planning areaPlanning region: Central