County grid record

Grid connection in M.D. of Wainwright No. 61

M.D. of Wainwright No. 61 has 5 tracked substations on Alberta’s transmission grid. Browse the local grid from the map into each individual station record.

Tracked substations5
Voltage levels69, 138 kV
Planning areasProvost, Wainwright
Infrastructure map

Boundary and substations

Use this preview to orient yourself, then open the full infrastructure map to explore the surrounding area.

Open infrastructure map →
Substations

Substations in M.D. of Wainwright No. 61

Ordered from highest to lowest voltage. Open a station for its Connection Project List context, nearby infrastructure, and full record.