County grid record

Grid connection in Thorhild County

Thorhild County has 1 tracked substation on Alberta’s transmission grid. Browse the local grid from the map into each individual station record.

Tracked substations1
Voltage levels138 kV
Planning areasAthabasca/Lac La Biche
Infrastructure map

Boundary and substations

Use this preview to orient yourself, then open the full infrastructure map to explore the surrounding area.

Open infrastructure map →
Substations

Substations in Thorhild County

Ordered from highest to lowest voltage. Open a station for its Connection Project List context, nearby infrastructure, and full record.